Knowledge · technical notes

What decides whether a handover passes first time.

Short, exact explainers on fibre types, polarity, testing, labelling and validation. Written for the hall floor.

Field notes

Notes on mobilisation, vetting and handover.

Every field note we have published, from pre-mobilisation checks to work in live buildings.

12 more field notes
Field notes5 minWhat an AI Hall Changes for Cabling EngineersTwenty-two engineers, one month, one AI cluster in Johor: what changed on the floor when the racks were GPU racks, and what stayed the same.Read the note Straight answers4 minWhy Fluke Results Get Rejected, and How to Build a Test Pack That Passes ReviewMost rejected results were set up wrong before the tester was switched on. How consultants review a pack, and how to run testing so yours passes.Read the note Workforce4 minCabling and the Critical Path: The Cost of Booking Engineers LastCabling sits at the end of the programme, so every upstream slip lands on it. How late booking turns it into the critical path, and what to book when.Read the note How we work4 minWorking in Live Buildings: How to Get Invited BackThe rules for cabling work in an occupied building: out-of-hours windows, permits, protection and clean-down, and why they decide whether you are asked back.Read the note Case notes4 minCross-Border Deployments: The Work Before the WorkWhat goes into putting fibre engineers on site in another country, and why the paperwork decides the start date more than the splicing does.Read the note How we work4 minWhat a Good Handover Pack ContainsFive documents that decide whether your network can be maintained, and what each one costs you when it is done badly.Read the note Straight answers4 minThe Cheapest Day Rate Costs More: Run the MathsWhat the lowest quote leaves out, and where those costs land by the end of the programme.Read the note How we work4 minHow a mobilisation runsFrom the first call to engineers on site: what happens, in order, when a programme needs engineers it does not have.Read the note How we work4 minWalking the hall: what we check before handoverThe final walk before a cabling package is handed over, stop by stop: the drawings, the racks, the containment overhead and the test results.Read the note Workforce4 minThe data-centre skills shortage is a delivery riskPower and cooling get most of the coverage. Many programmes slip for a simpler reason: too few certified people to install and test the cabling.Read the note Infrastructure4 minWhy data centres replace cabling before it failsCabling degrades without warning. By the time it shows up in your error logs, it has already cost you throughput.Read the note About us3 minNo account managers. A founder answers for every job.What we do is not unusual. The difference is who picks up the phone and who is on the job.Read the note

Engineers who work to this standard.

Book engineers for your team with GO2 Supply, or hand us the package with GO2 Deliver.

Vetted and cardedFully insuredCompanies House 17038183Shortlist the same day