GO2 Deliver · cabling and fibre packages
Your cabling package, delivered to handover.
Structured cabling and fibre for live and new-build data halls, built to your drawings. One point of responsibility, from the first pull to handover.
The outcome
One point of responsibility for the whole cabling package.
- 01
Handed over on the agreed date
A programme agreed with you, a signed gate at each stage and a daily record of progress and blockers.
- 02
Every link tested and traceable
Tested to your specification, the result named by cable ID, the label carrying the same name.
- 03
Our supervisor on site
Our supervisor leads the cabling team. We review every result before it reaches your client.
Companies House 17038183Fully insuredOur engineers: 20 countriesScope questions the same working day
The scope
Six packages. Each one ends in a record you can check.
For hyperscale and AI halls, colocation builds, enterprise rooms and live sites. Scoped in metres, cores and ports, with the evidence named up front.
Estimate the scope
01
Data-hall structured cabling
Copper and fibre in the white space, rack to rack and rack to panel, installed, terminated, tested and labelled.
Leaves a test file per link, the label schedule, as-builts

02
Backbone and high-density fibre
Pulls, MPO trunks and splicing between halls and buildings, single-mode, ribbon and loose tube, for 400G and 800G.
Leaves OTDR traces, the loss budget sheet

03
MMR and ODF build-out
Optical distribution frames, the cross-connect field and carrier patching, mapped port by port.
Leaves port maps, the test pack

04
Splicing and termination
Fusion splicing, mass-fusion ribbon and pre-terminated cassette installs.
Leaves the splice-loss report

05
Testing and validation
Certification, re-tests of another firm's work and channel validation, with test records for your commissioning team. Nights if needed.
Leaves the certification pack, validation records

06
Recabling and Day 2 change
Strip out, re-route and re-label in live halls, inside your change windows. Moves, adds and changes on written request.
Leaves before and after photographs, new as-builts
The delivery method
Five gates between the drawings and the handover.
Nothing moves to the next gate until the last one is signed.
Scope and programme
Drawings, quantities in metres, cores and ports, the specification and the dates.
Signed The priced scope, in writing
Method and test plan
Method statement, RAMS and the test plan, accepted by the site before we mobilise.
Signed RAMS, method and test plan
First-install inspection
We install, test and inspect the first panel with you. The rest of the hall follows that standard.
Signed The first-install approval
Daily record
Installed, tested, validated and failed, every shift, on one sheet your package manager reads.
Signed The daily record, every shift
Handover
Snags closed, the pack indexed in your client's format and checked against their standard before it is submitted.
Signed The indexed handover pack
The handover
The pack your client signs off.
Rejected results hold up handover. We build the pack as the work goes in and check it against your client's standard before it is submitted.
- 01Pack index and scope summary
- 02Copper certification results, one per link
- 03Fibre Tier 1 results and OTDR traces
- 04Loss budget and splice-loss report
- 05Label schedule to TIA-606 or your scheme
- 06Port maps and cross-connect records
- 07As-built drawings and rack elevations
- 08Validation records, method statement, RAMS and the daily records
| Cable ID | Test | Limit | Result | Margin |
|---|---|---|---|---|
| DH2-R04-P01:01-02 | OS2 · Tier 1 loss | 1.20 dB | 0.41 dB | 0.79 dB |
| DH2-R04-P01:03-04 | OS2 · Tier 1 loss | 1.20 dB | 0.44 dB | 0.76 dB |
| DH2-R04-P01:05-06 | OS2 · OTDR events | 0.30 dB/event | 0.12 dB max | 0.18 dB |
| DH2-R05-C12:24 | Cat6A · Permanent link | Class EA | PASS | 3.1 dB NEXT |
| DH2-R05-C12:25 | Cat6A · Permanent link | Class EA | Re-test | Re-terminated |
A failed link is cleaned, re-terminated and re-tested. The pack carries the passing result under the same cable ID.
Sectors
Built for mission-critical environments.
- HyperscaleMulti-hall campus builds against a fixed live date.
- AI and high-density hallsDense fibre for 400G and 800G fabrics, ribbon and MPO.
- ColocationLive halls, cross-connect fields and meet-me rooms.
- Enterprise and edgeComms rooms, edge rooms and backbone between buildings.
Where our engineers have worked
The UK, Europe, the Middle East and Asia.
Pins mark where our engineers have worked. Pick a region, then a pin.
Drag to move · pinch to zoom · tap a pin
Our engineers have worked here · United Kingdom
London
Hyperscale and colocation data centres
Several sites · teams of 10 to 20
Structured cabling, fibre backbones, rack builds, patching and full test packs in live and pre-live halls, under data-centre access clearance.
United Kingdom
Europe
Middle East
Asia
Questions
What clients ask before handing us a package.
Who leads the work on a GO2 Deliver package?
How is a package priced?
Can you take over a package another firm started?
Do you work as a structured cabling subcontractor outside the UK?
Do you validate as well as certify?
What do we receive at handover?
Do you work in live data halls?
Which standards do you work to?
Send us the package
Send the drawings and the programme.
The scope, the test specification, the start date and the handover date. No site name needed yet. The price comes back in writing.
