Pro tool · for data-centre engineers and designers
MPO polarity planner
Build your channel: optic, cords, adapters, trunk, cassettes. Watch every lane trace from transmitter to receiver, with pass or fail per lane, the pin and gender check, the polish check, the one-part fix and a bill of materials.
Optic at both endsIEEE 802.3bm cl. 95.
Start from
Optic A (pinned port)
Cord at AMPO-12
End towards A
End towards B
Adapter 1
TrunkMPO-12
End towards A
End towards B
Adapter 2
Cord at BMPO-12
End towards A
End towards B
Optic B (pinned port)
Connector polish (whole chain)
PASS: every lane lands on its receiver8 of 12 fibres lit, 4 dark
Bill of materials
- · MPO-12 cord at A, Type B, female to female, UPC
- · MPO-12 trunk, Type B, male to male, UPC
- · MPO-12 cord at B, Type B, female to female, UPC
- · MPO-12 adapter, key-up to key-up
- · MPO-12 adapter, key-up to key-up
Base-12 with a 4-lane optic leaves positions 5 to 8 dark. Base-8 trunks use every fibre.