Tool · for supervisors and engineers on site
Site Board
Your drawing on your phone. Pin snags, redlines, finished areas and blocked fronts with a photo, move each rack from installed to validated, keep the daily record and hand over to the next shift. Then send the marked-up PDF. Demo data.
Issues on Demo hall DH3
Every mark on the drawing, with its photo and time. Send it before you leave site.
Today · days
The record that settles arguments later: who was here, what stopped you, who asked for extra.
Progress
Crew on site · 8 people · 80 h
- Supervisor110
- Fibre technicians410
- Copper technicians210
- Test engineer110
People, then hours each. Roles only, no names.
Permits in place
What stopped you
Write it down the hour it happens. A delay with a time on it can be claimed; one from memory cannot.
- Access · 40 minTwo gate passes missing at 07:00. Security list not updated.Earlier
- Blocked · mark 3D03 to D08 not free: raised-floor team in the aisle until Thursday.Earlier
Extra work someone asked for
Weekend, overtime or work outside the package only counts if the site asked in writing. A text or an email is enough.
Send today's record to the office
GO2 Site Board · DEMO DATA Demo hall DH3 · today · Days Crew on site: 8 people, 80 h Supervisor: 1 × 10 h Fibre technicians: 4 × 10 h Copper technicians: 2 × 10 h Test engineer: 1 × 10 h Permits: Permit to work, data hall (PTW-0418); Work at height, podium steps Today: +0 installed, +0 terminated, +0 tested, +0 validated Hall: 10 of 32 racks validated, 14 tested or better Open marks: 1 snags, 1 redlines, 1 blocked Lost time: 40 min Access, 40 min: Two gate passes missing at 07:00. Security list not updated. Blocked (mark 3): D03 to D08 not free: raised-floor team in the aisle until Thursday. Last handover (Yesterday · Nights): Done: Row B tested up to B06. Results saved. Open: B06: Cat6A C07 failed NEXT. Re-terminate before validating. Start with: Retest B06, then walk row B with the client's QA.
Demo: the text goes through the site form, nothing else. Photos stay on the phone.
Shift handover
Three lines so the next shift starts where you stopped, not where they guess.
Saved on this phone and added to today's record.
Earlier handovers
- Yesterday · Nights
DoneRow B tested up to B06. Results saved.
OpenB06: Cat6A C07 failed NEXT. Re-terminate before validating.
Start withRetest B06, then walk row B with the client's QA.