Services · the full scope
Cabling, fibre, testing and validation. Nothing else.
Live and new-build data halls, from high-density fibre and ribbon splicing to certification, validation and the handover pack.
Two ways to buy it
Our engineers on your job, or our team on the whole package.
- Vetted and cardedRight to work, cards and experience checked before a name reaches you.
- Fully insuredPolicy details on request.
- Companies House 17038183GO2DATAWORKS LTD, England and Wales. Check the record
- 20 countriesWhere our engineers have worked, from hyperscale and AI halls to fibre networks. Coverage
- Shortlist the same working dayNamed engineers with their cards, or our questions on your scope.
How we work
Five steps. Each one in writing.
You send the request
Roles and dates, or the drawings and the programme. No site name needed yet.
A shortlist the same working day
Named engineers with their cards and experience, or our questions on the scope.
The rate in writing
Day rates or the package price, travel and terms, agreed before anyone moves.
Mobilisation
Inductions booked, cards checked, travel and permits arranged before day one.
The daily record
What was installed, tested and failed, every shift, until handover.
The full scope
From the meet-me room to the last patch panel.
Hyperscale and AI halls
High fibre counts, dense racks and fixed live dates.
The 4 parts
- High-density rowsRows of high-density cabinets, overhead fibre pathways and tight commissioning windows.
- 400G and 800G cluster fibreParallel single-mode and multimode links for GPU fabrics, to the design's loss budget.
- Ribbon fibre and mass-fusion splicingHigh-count ribbon cables spliced twelve fibres at a time, with every splice read and recorded.
- MPO/MTP trunks and cassettesPre-terminated trunks, cassettes and harnesses, installed to one polarity method across the whole link.
Structured cabling
Copper and fibre, from the meet-me room to the last patch panel.
The 6 parts
- Copper Cat6A and Cat8Pulled, dressed, terminated and patched to the drawing and the cable schedule.
- Fibre OS2, OM4 and OM5Backbone and horizontal fibre, fusion spliced or pre-terminated.
- ContainmentTray, ladder and basket, set out from the drawings and installed at height where needed.
- Rack and cabinet fit-outCabinet builds, cable management, patching fields and blanking.
- Labelling to TIA-606Both ends of every cable, every port and panel, to the client's scheme.
- Recabling and Day 2 changeStrip out, re-route and re-label in live halls, inside your change windows.
Testing and validation
Proof that every link works, and that the system works as designed.
The 6 parts
- CertificationCopper and fibre certification to the standard your specification names.
- OTDR and LSPMTier 2 traces for every event on the link; Tier 1 loss against the budget.
- Link validation and acceptanceResults checked against the specification before they reach your client.
- Channel validationChannels proven through the patching and port maps checked against the design, for your commissioning team.
- Night validation shiftsValidation teams on nights when the programme runs a second shift.
- Documentation and handover packsResults named by cable ID, label schedules, port maps and as-builts.
Supervision and engineers by role
Our supervisor on a GO2 Deliver package. Our engineers on yours.
The 6 parts
- Supervision and QAA GO2 supervisor and a daily record on every GO2 Deliver package.
- InstallersCopper and fibre installers who read the drawing before the first pull.
- Fibre splicersSingle-fibre and ribbon fusion splicing into trays, cassettes and closures.
- Testers and validation engineersCertification, OTDR, results naming and channel validation.
- Supervisors, site and project managersTo run the day, the permits, the daily record and the handover.
- QA and test leadsResults reviewed against the specification; witness tests with your commissioning team.
Certification with Fluke DSX and Versiv testers where the specification calls for them; OTDR and LSPM to the loss budget. Product names are trademarks of their owners.
In the white space
Racks, trunks, panels and ports. Every link ends in a test file.
We pull it, splice it, terminate it, test it, validate it and label it, then hand over a record your client can check link by link.
Our standards
The standard behind every link.
What we test, how we label and what you receive at handover. The same on a two-engineer job and a full hall.
- Test results
Every link tested to the limit in your specification. Results saved as the tester's own files, never retyped.
You receive: Native result files and PDF reports - Labelling
Both ends of every cable, every port and panel, to TIA-606 or your scheme. The label is the result name.
You receive: Label schedule - Documentation
No start without RAMS the site has accepted. A daily record while we work.
You receive: Daily record sheet - Handover pack
Indexed and complete, in your client's format, checked against their standard before it is submitted.
You receive: Indexed handover pack
Credentials
Credentials
- Standards we work to
- TIA-568TIA-606ISO/IEC 11801BS EN 50174IEC 61280-4
- Cards our engineers hold, where the site requires
- ECSCSCSIPAFPASMASSSTSSMSTS
- Company
- Companies House 17038183Fully insured
Standards are the ones we work to. They are not certifications.
Sectors
Where the work is.
Hyperscale
Multi-hall campus builds against a fixed live date.
AI and high-density halls
Dense fibre for 400G and 800G fabrics, ribbon and MPO.
Colocation
Live halls, cross-connect fields and meet-me rooms.
Enterprise and edge
Comms rooms, edge rooms and backbone between buildings.
Contact
Tell us the scope. We tell you how we would run it.
Roles and dates, or the drawings and the programme. A person reads it and replies the same working day on active projects.
