From the first panel to the handover pack.

What happens to each link between the first termination and the handover pack, and what you receive at the end. The full Gate Dossier is sent on request, under NDA if you need it.

The process.

  1. Inspect

    End-faces are inspected before mating, and cleaned or re-terminated when they fail.

    IEC 61300-3-35

  2. Terminate

    Copper and fibre terminated to the drawing and labelled to your schedule.

  3. First-Article Gate

    Each engineer's first panel is tested straight away, on your tester if there is one on site. Volume starts after it passes.

    GD-05

  4. Test

    Links tested to the limits your specification names: Tier 1 loss, and Tier 2 with an OTDR where it asks.

    Tier 1 · Tier 2 · OTDR

  5. Handover

    Results named by cable ID and handed over as the tester's own result files and PDF reports, with the as-built.

One page from a Gate Dossier.

The engineer list is the first page of every dossier. This example, with invented and redacted details, is the only document we show in public.

GO2DataWorks · Gate Dossier

GD-01 · Engineer list

EXAMPLE

Package: fibre backbone, data hall

Region: South-East England

Start: week

Team lead: R..

#InitialsRoleCardExpiryChecked on scheme portal
1A.B.Team leadECS /2028
2C.D.Fibre splicerECS /2027
3E.F.Fibre terminatorECS /2027
4G.H.Copper terminatorECS /2028
5J.K.TesterECS /2027

Cards checked on the scheme's own portal before travel. No ID documents, no photos of cards, no nationality.

Example. Names, card numbers and dates are invented or redacted. Real dossiers go only to the client they are for.

What the Gate Dossier contains.

  • GD-01Engineer listOne line per person: initials, role, card type and expiry, and the date we checked the card on the scheme's portal.
  • GD-02RAMSTask-specific, adapted to your site pack and issued for your approval before anyone travels.
  • GD-03Test planWhich links, which tester, which limit, Tier 1 or Tier 2, and the first-article panels.
  • GD-04Daily report formatWhat you receive at the end of each shift: progress against plan, issues and tomorrow's plan.
  • GD-05First-Article Gate recordsAdded on day one, one per engineer.

The pack is sent on request, under NDA where you need it. Nothing here is a public download.

Questions about testing.

Can I download a sample test report?

Not from this page. Ask, and we send the report format with the Gate Dossier pack, under NDA if you need it.

Which tester do your engineers use?

The one your specification names. If the site has its own tester, the first-panel test runs on it.

What happens when a link fails?

It is cleaned, re-terminated and re-tested, and the pack carries the passing result under the same cable ID.