Tool · for package buyers

Scope Estimator

Describe the halls, racks, trunks and backbone. Get the terminations, splices, test records, labels and engineer-days the package really holds, and how long it takes with the team you choose. No prices.

The hall

Backbone

Estimate · no pricesGO2 Deliver
134Engineer-days
3.4Weeks with 8
7,488Test records
1,920Copper links
3,840Terminations
160MPO trunks
4,416Fibres
1,152Splices
4,328Labels

Where the days go

Copper termination48 days
Copper certification10 days
MPO trunk install20 days
Backbone splicing10 days
Fibre Tier 1 testing15 days
OTDR traces4 days
Labelling11 days

The handover pack will hold

  • 1,920 copper certification results, one per link
  • 4,416 fibre Tier 1 results
  • 1,152 OTDR traces, both directions
  • Label schedule, about 4,328 rows, to TIA-606 or your scheme
  • As-built drawings, port maps and the splice-loss report

Planning figures from the assumptions above plus 15% for set-up, snagging and the pack. Access, containment readiness and change windows move them; a priced reply needs the drawings.

How it works

Plain rules, no account, nothing sent.

  • Quantities first

    Every number starts from your halls, racks and cores, so it can be checked against the drawings.

  • Assumptions you can edit

    Productivity per engineer-day is a planning default. Change any figure to match your site and the estimate follows.

  • The pack, counted

    It tells you how many results, traces and labels the handover pack will hold before anyone starts.

  • No prices

    No rates or price bands anywhere. A priced reply needs the drawings and comes back in writing.