Hall Planner

Three answers in: rows, racks per row, where the MMR is. Out comes a scaled hall drawing with the tray routes, every trunk length to order, the cable list, TIA-606 labels, the materials and the test plan. Demo data, no prices.

Hall Planner

LON1 · DH2 · Demo data

DOORCOLD AISLEHOT AISLECOLD AISLEHOT AISLECOLD AISLEA01A02A03A04A05A06A07A08A09A10A11A12B01B02B03B04B05B06B07B08B09B10B11B12C01C02C03C04C05C06C07C08C09C10C11C12D01D02D03D04D05D06D07D08D09D10D11D12E01E02E03E04E05E06E07E08E09E10E11E12F01F02F03F04F05F06F07F08F09F10F11F12M01M02M03M04M05M06ROW AROW BROW CROW DROW EROW FMMR M01–M06TR-X BACKBONE 600 × 15016,20018,000N05 m1:125
72 racks288 trunks3,456 fibres1,728 Cat6A5.5 km of trunk26 m longest1:125 @ A3

Send this hall to GO2

We get the hall inputs and the totals below, nothing else. You get a reply by email.

What we receive
{
  "demo": true,
  "site": "LON1",
  "hall": "DH2",
  "rows": 6,
  "racks_per_row": 12,
  "rack_u": 42,
  "mmr": {
    "side": "W",
    "position_pct": 50
  },
  "per_rack": {
    "os2_trunks": 2,
    "om4_trunks": 2,
    "om5_trunks": 0,
    "fibres_per_trunk": 12,
    "cat6a_links": 24
  },
  "slack_pct": 10,
  "loop_m": 1.5,
  "row_tray": "300x100",
  "backbone_tray": "600x150",
  "totals": {
    "racks": 72,
    "mmr_racks": 6,
    "trunks": 288,
    "fibres": 3456,
    "cat6a_links": 1728,
    "trunk_m": 5512,
    "cat6a_m": 31238,
    "longest_m": 26
  },
  "checks": [
    "warn: Row tray over 40% full in rows A, B, C, D, E, F. Pick a wider tray in More options.",
    "bad: Backbone over 40% full even at 600 × 150. Split it into two routes."
  ]
}

We use these details to answer you, as set out in our privacy notice.

How it works

What it catches before the drums arrive.

  • Short trunks, caught early

    Pre-terminated trunks are made to length. Every length here follows the tray from rack to MMR, then adds slack and loops before it rounds up.

  • Copper over 90 m, caught early

    Cat6A stops at 90 m. Move the MMR and watch the long runs come back inside the limit before anything is pulled.

  • One set of names

    Racks, panels and ports get TIA-606-C IDs before the first drum arrives, so the labels, the cable list and the test results match.

  • Planning, not construction

    Demo data and planning values. A construction issue needs the survey, the client's standards and a checked drawing.